ZPMC Safety Portal

2 employees active · 96% training compliance · 0 LTI (YTD) · SMOM 2026-07

Stage 01 · Orientation — one line runs through everything we build

EVERYONE GOES HOME.

Safety at ZPMC is not a poster on a wall. It is a skill you build, stage by stage, starting the day you walk in. This portal is where that work happens.

Stage 02 · Induction

IND-05 · Rev 04 · IS 45001

Your induction: five plates on one rail.

  1. M-0110 min

    Seeing the hazard

    Train your eye before your hands. Spot lines of fire, pinch points and suspended loads the way a rigger does.

  2. M-028 min

    Permits and lockout

    Why a signed permit and a personal lock are the two strongest tools you own on any ZPMC site.

  3. M-0312 min

    Working under cranes

    Exclusion zones, signal discipline and what a load path means for where you stand.

  4. M-048 min

    When something goes wrong

    Stop-work authority, first response and how an honest report protects the next person.

  5. M-057 min

    Your first day, walked through

    PPE issue, muster points, site sirens and who your safety contacts are — before you need them.

Completed in order. Your supervisor is notified the moment you finish — nothing to print, nothing to email.

Start your induction now →

Stage 03 · Competency

Permit board · Live · ±0 tolerance on validity

Your record, read like a load chart.

72%
Record completion · demo reading

Sign in and your dashboard reads like a permit board: what is valid, what is due, and nothing you have to hunt for. Supervisors see their whole crew the same way.

  • IND-05

    Safety induction

    Valid to Jan 2027 · Issued PUNE-Y3

    Valid
  • WAH-02

    Work at height refresher

    Valid to Nov 2026 · Practical assessed

    Valid
  • LOTO-1

    Lockout / tagout

    Complete by 15 Aug · Supervisor notified

    Due

Illustrative example — sign in to see your own record. Open your dashboard →

Stage 04 · Authorization & growth

Lift plan FY 26–27 · Slots reserved

What gets rigged next.

The induction is the first load on the line, not the last. New modules and internal tools are rigged onto the same portal as they are ready.

  • TRN-06

    Crane commissioning fundamentals

    Q4 2026 · Reserved
  • TRN-07

    Incident investigation: 5 Whys in practice

    Q4 2026 · Reserved
  • TRN-08

    Contractor safety onboarding

    Q1 2027 · Reserved
  • TLS-01

    Site observation reporting tool

    Q1 2027 · Reserved